Kyle Goodyear

Construction Management

C-5 Fuel Cell Facility

Martinsburg, WV

This is a student-generated Capstone Project e-Portfolio (CPEP) produced in conjunction with the AE Senior Thesis e-Studio.

Date
Announcement
4.25.10
CPEP site complete
4.25.10
4.11.10
3.30.10
3.25.10
2.24.10
Milestone 2 activities completed
2.17.10
Milestone 2 activities nearly completed
1.31.10
Milestone 1 activities completed
1.12.10
12.10.09
11.28.09
10.28.09
10.11.09
10.4.09
9.10.09
9.9.09
9.2.09
Website up and running
8.28.09
Building Statistics Part 1 Due
8.24.09
Fall Semester Classes Begin
8.13.09
Visited Construction Site and Received Drawings and Specs
6.26.09
Received Owner Permission
   

User Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work-in-progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Kyle Goodyear. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design.

 

 

C-5 Aircraft

The Capstone Project Electronic Portfolio (CPEP) is a web-based project and information center. It contains material produced for a year-long Senior Thesis class. Its purpose, in addition to providing central storage of individual assignments, is to foster communication and collaboration between student, faculty consultant, course instructors, and industry consultants. This website is dedicated to the research and analysis conducted via guidelines provided by the Department of Architectural Engineering. For an explanation of this capstone design course and its requirements, click here.

Structural steel on west side of building.

Picture taken 8/13/09

Interior of existing hangar. Fuel Cell Facility will have similar interior.

Picture taken 8/13/09

Interior of Fuel Cell Facility under construction.

Picture taken 1/5/10

Beginning installation of MEGADoor system on South face.

Picture taken 1/5/10

Senior Thesis The Pennsylvania State University Architectural Engineering AE Computer Labs

Contact Kyle at justbuildit7@gmail.com

This page was last updated on April 6, 2010 by Kyle Goodyear and is hosted by the AE Department ©2009