|  | 
          
            | Final Report |  
            | 
              
                |  |  
                |  |  
                | Final Report |  
                |  |  
                |  | This report is an analysis of  the Butler Memorial Hopsital's New Inpatient Tower with a focus on the mechanical systems. Contained within, are details regarding the original design, as well as a propsed redesign which should enable energy and cost savings.  |  
                |  |  
                |  |  
                | Executive Summary |  
                |  |  
                |  |   |  
                |  |  
                |  |  
                |  |  
                |  |   |        |  
            | 
              
                |  |  
                | Note: While great efforts have been taken to provide accurate and complete   information on the pages of CPEP, please be aware that the information contained   herewith is considered a work‐in‐progress for this thesis project. Modifications   and changes related to the original building designs and construction   methodologies for this senior thesis project are solely the interpretation of   Matt Geary. Changes and discrepancies in no way imply that the original   design contained errors or was flawed. Differing assumptions, code references,   requirements, and methodologies have been incorporated into this thesis project;   therefore, investigation results may vary from the original design. |  
                | Senior Thesis Home |  |  |  | msg5039@psu.edu |  
                | This page was last updated on 04/07/2011 by Matthew Geary and is hosted by the   AE Department ©2010 |  |  |