FISK Corporate Headquarters
Houston, Texas
Stephen Blanchard | CM Option
 

Technical Reports

   
Technical Report 1 is an in-depth analysis of the current existing conditions of the project. The building's schedule, costs, systems, and site were investigated in an effort to gain familiarity with the overall project status.
   
Technical Report 2 is an analysis of key features of the project that affect project execution. Evaluation of the project's detailed schedule, electrical system estimate, general conditions, BIM uses, and constructability challenges was completed in an effort to complete this analysis.
   
Technical Report 3 is an analysis of areas of the project that are candidates for further research and evaluation. In order to isolate these areas, analysis of the project's LEED evaluation, potential schedule acceleration scenarios, value engineering, and applications of critical industry issues were completed.
   
 

"Note: While great efforts have been take to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work-in-progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Stephen Blanchard. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design"

 
|
|
|
|
This page was last updated on 11/12/2012, by Stephen Blanchard and is hosted by the AE Department ©2012/2013