METRO MUSEUM OF AMERICAN ART
LOCATION: MAJOR CITY, USA
VINCENT A. ROSSI - CONSTRUCTION MANAGEMENT OPTION
View of the Metro Museum from the North.

 

 

Technical Reports

// HOMEPAGE
// STUDENT BIOGRAPHY
// BUILDING STATISTICS
// THESIS ABSTRACT
// TECHNICAL REPORTS
// THESIS PROPOSAL
// PRESENTATION
// FINAL REPORT
// REFLECTION
// E-STUDIO

 

 

 

   

Technical Report 1:

Technical Report 1 will provide an overview of the construction of the Metro Museum of American Art. Included in this report will be an analysis of the project schedule, building systems, costs, site logistics, and the project delivery system. To view please click the image on the right.

Updated: 9/21/12

 

Technical Report 2:

This Technical Report will provide an overview of the construction of the Metro Museum of American Art. Included in this report will be a detailed analysis of the project schedule, structural and general conditions estimates, building information modeling use, and constructability challenges. In order to view the report please click the image on the right.

Updated: 10/12/12

Technical Report 3:

This Technical Report will provide an overview of the construction of the Metro Museum of American Art. Included in this report will be a detailed analysis of the LEED requirements, schedule, value engineering topics, critical industry issues, and technical analysis options. In order to view the report please click the image on the right.

Updated: 11/12/12

 

About AE Senior Thesis:

The Capstone Project Electronic Portfolio (CPEP) is a web‐based project and information center. It contains material produced for a year‐long Senior Thesis class. Its purpose, in addition to providing central storage of individual assignments, is to foster communication and collaboration between student, faculty consultant, course instructors, and industry consultants. This website is dedicated to the research and analysis conducted via guidelines provided by the Department of Architectural Engineering. For an explanation of this capstone design course and its requirements click here.

 

 

Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work‐inprogress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Vincent A. Rossi. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design.

Note: All images on this page are property of Renzo Piano Building Workshop.

Contact Vinnie
This page was last updated on 11.13.12, by Vincent A. Rossi and is hosted by the AE Department ©2012