The goal of Technical Assignment 1, Construction Project Management is to began research and understanding the existing conditions and designs under which Crystal Plaza II is currently being constructed. This initial research provides basic knowledge of opportunities and drawbacks that may affect the construction process. Construction management areas addressed in this report are:

  • Project Schedule
  • Building Systems
  • Project Cost
  • Site Planning of Existing and General Conditions
  • Local Conditions
  • Client Background
  • Project Delivery
  • Project Staffing

To view the report in .pdf format, please click the link below

Technical Report 1

*Please note that the schedule, cost evaluation, staffing plan, and project organizational chart have been created by Christopher Stultz. While great effort was made to make these as accurate and realistic as possible, they may not reflect the current, actual data from the project.

Cost and Schedule Analysis

The goal of Technical Assignment 2 is to analyze key features of the project that affect project execution. Determination of important schedule attributes and the costs of a key building system are discussed in this report. The areas addressed are:

  • Detailed Project Schedule
  • Site Layout Planning
  • Detailed Structural Estimate
  • General Conditions Estimate
  • Critical Industry Issues

To view the report in .pdf format, please click the link below

Technical Report 2

*Please note that the schedule, cost evaluation, and site layouts have been created by Christopher Stultz. While great effort was made to make these as accurate and realistic as possible, they may not reflect the current, actual data from the project

 

Alternative Methods Analysis

The goal of Technical Assignment 3 is to begin analyzing areas on the project that are good topics for research, alternative methods, value engineering, and schedule compression. The report is broken into two sections, the first an interview portion with current project team members, and the second is observations about the project, problem identification, and technical analysis methods

To view the report in .pdf format, please click the link below

Technical Report 3

 

   
   
 
 
 
     
   