Justin D. Schultz

Mechanical Option
Hauptman Woodward Medical Research Institute
Buffalo, New York

This is a student-generated Capstone Project e-Portfolio (CPEP) produced in conjunction with the AE Senior Thesis e-Studio.

Welcome to Justin's AE Senior Thesis e-Portfolio


Technical Assignments

 

Technical Assignment 1: ASHRAE Standard 62.1-2004 Ventilation Compliance

This report evaluates the ASHRAE Standard 62.1-2004 ventilation compliance procedure for the Hauptman Woodward Medical Research Institute.

Please click here to view the full report. (.pdf)
Executive Summary

 

Technical Assignment 2: Building and Plant Energy Analysis

This report evaluates several building energy analysis procedures at the Hauptman-Woodward Medical Research Institute, including LEED-NC 2004, ASHRAE 90.1-2004, and a Trane TRACE-700 building and and plant analysis.

Please click here to view the full report. (.pdf)
Executive Summary

 

Technical Assignment 3: Mechanical Systems Existing Conditions Evaluation

This report develops an extensive evaluation of the existing mechanical systems at the Hauptman-Woodward Medical Research Institute.

Please click here to view the full report. (.pdf)
Executive Summary

 

Senior Thesis | The Pennsylvania State University | Architectural Engineering | AE Lab | Contact Justin |
This Page was last updated on November 20, 2006 , By Justin Schultz and is hosted by the AE Department ©2006.