Columbia, South Carolina

Holder Construction Company

Adam De Luca
Construction Management

 
  Thank you for visiting my website, I hope you enjoy your stay.
   
Sponsored by

Holder Construction Company 



Final Report


This thesis focuses primarily on the curtain wall for Main & Gervais. The first analysis examines the two methods for constructing a curtain wall, stick-built (current method) and prefabricated (proposed method). The second analysis examines the design of the curtain wall by evaluating the efficiency and providing a better alternative.

Complete Final Report (pdf)

Executive Summary (pdf)

Curtain Wall Prefabrication Analysis (pdf)
- Construction Depth

Curtain Wall Design Analysis (pdf)
- Structural Breadth
- Mechanical Breadth

Thesis Conclusion (pdf)

Appendices (pdf)