Tyler Jaggi Senior Thesis

Construction Management

 

Thesis Research

 

Resources & Special Thanks To:

Saint Vincent Health Center
EE Austin’s Project Team
Saint Vincent Project Team
Penn State AE Faculty
Dr. David Riley – CM Advisor

 

Specific References:

Premier, 2006.Infection Control Risk Assessment (ICRA), http://www.premierinc.com/quality-safety/tools-services/safety/topics/construction/icra.jsp

 

SlenderWall Architectural Precast Concrete and Steel Stud Building Panels. Web.<http://www.slenderwall.com/index.shtml>.

 

"Building Envelope Design Guide - Masonry Wall Systems | Whole Building Design Guide." WBDG - The Whole Building Design Guide. Web. 01 Feb. 2010. <http://www.wbdg.org/design/env_wall_masonry.php>.

 

"Building Envelope Design Guide - Precast Concrete Wall Systems | Whole Building Design Guide." WBDG - The Whole Building Design Guide. Web. 01 Feb. 2010. <http://www.wbdg.org/design/env_wall_precast_concrete.php>.

 

C. B. Tatum, T. K. (2000). Coordinating Building Systems: Process and Knowledge. Journal of Architectural Engineering , Vol. 6 (No. 4).


Computer Integrated Construction Research Program. (2009). “BIM Project Execution Planning Guide – Version 1.0.” October 8, The Pennsylvania State University, University Park, PA, USA.


Messner, J., & Leicht, R. (2008). Moving Towarrd an Intelligent Shop Modeling Process.   Journal of Information Technology in Constrcution , Vol. 13, pg. 286‐302.


Staub‐French, S., & Khanzode, A. (2007). 3D and 4D Modeling for Design and Construction Coordination: Issues and Lessons Learned. Journal of Information Technology in  Construction, Vol. 12, pg. 381‐406.