Nemours Rendering Edit
HOME
CAITLIN BEHM
BUILDING STATISTICS
THESIS ABSTRACT
TECHINCAL ASSIGNMENTS
THESIS RESEARCH
THESIS PROPOSAL
PRESENTATION
FINAL REPORT
REFLECTION
E-STUDIO

Technical Reports

tech i

 

Technical Report I examines the existing structural systems of Nemours Children's Hospital as a part of The Nemours Foundation. The report includes descriptions of the structural systems, wind analysis, seismic analysis, and spot checks of typical structural members.

Note: A revised version of Technical Report I replaced the original version 12/09/11.

tech II

Technical Report II examines the existing floor system and three alternate floor systems and are as follows: two-way flat slab with drop panels, pre-cast hollow core planks on steel beams, steel deck with steel beams and girders, and one-way slab with continuous T-beams. The report includes feasibility compairsons of each system to determine which system is most beneficial for the design.

Note: A revised version of Technical Report I replaced the original version 12/09/11.

 

Tech III Technical Report III anaylizes the lateral system's response to the seismic and wind loads calculated in Technical Report I. The lateral system in Nemours Children's Hospital as a part of The Nemours Foundation consists of 39 shear walls of varying heights. This report checks drift, displacement, torsion, and overturning moment. Spot check of a typical shear wall verifies the ETABS model output.

 

 

 

 

NEWS

DATE
ANNOUNCEMENT
04/29/12
CPEP Complete
04/29/12
ABET Assessment & Reflection Posted
04/29/12
Thesis Final Presentation Posted (PDF)
04/04/12
Final Report Posted
01/16/12
Building Statistics II Posted
01/13/12
Proposal Revisions Posted
12/09/11
Proposal Posted
12/09/11
Tech II Revisions Posted
12/09/11
Additional Tech I Revisions Posted
11/16/11
Tech III Posted
10/24/11
Abstract Posted
10/19/11
Tech II Posted
10/19/11
Tech I Revisions Posted
9/23/11
Tech I Posted
9/12/11
Building Statistics I Posted
9/9/11
Student Bio Sketch Posted
9/9/11
Full Menu Functionality
9/2/11
Home Page Posted
8/26/11
Building Statistics I Complete
8/3/11
Owner Permission Obtained
8/1/11
Project Documentation Obtained
A special thanks to:

SGH

 

Nemours Logo

 

Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work-in-progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Caitlin Behm. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design.
This page was last updated on 04/29/2012 by Caitlin Behm and is hosted by the AE Department © 2011/2012