AMERICAN ART MUSEUM | NORTHEAST, UNITED STATES
HOME
SEAN FELTON STRUCTURAL
WELCOME TO SEAN FELTON'S ELECTRONIC PORTFOLIO

ANNOUNCEMENTS

 

 

The American Art Museum

The American Art Museum (AAM) will serve as a replacement to the owner’s current facility in New York City.  Figure 2 shows AAM’s new location in a vibrant district where aging warehouses, distribution centers, and food processing plants are being renovated and replaced by art galleries, shops, and offices.  AAM will stand in place of several such warehouses, and will provide a magnificent new southern boundary to the city’s recently renovated elevated park, which terminates on the eastern edge of the site.

This new facility is a multi-use building with gallery and administration space, two café/restaurants, art preservation and restoration spaces, a library, and a 170-seat theater.  Public space including the theater, classrooms, restaurants, and galleries are located on the south half of the building on the ground level and levels 5 through 8.  Mechanical, storage, conservation, offices, and administration are dispersed on the north side at each level.  The 220,000 square-foot AAM will stand 148ft tall and cost approximately $266 million.  Construction began in May 2011 and is expected to be complete in December 2014.

Capstone Project Electronic Portfolio

CPEP is a web-based project and information center. It contains material produced for a year-long Senior Thesis class. Its purpose, in addition to providing central storage of individual assignments, is to foster communication and collaboration between student, faculty consultant, course instructors, and industry consultants. This website is dedicated to the research and analysis conducted via guidelines provided by the Department of Architectural Engineering. For an explanation of this capstone design course and its requirements click here.

All images of the building are used with the permission of Renzo Piano Building Workshop

 

28 APR 2013 CPEP COMPLETE
22 APR 2013 REFLECTION POSTED
10 APR 2013 FINAL PRESENTATION POSTED
04 APR 2013

FINAL REPORT POSTED

13 MAR 2013 PROPOSAL REVISION 2 POSTED
08 JAN 2013 BUILDING STATISTICS II POSTED
08 JAN 2013 PROPOSAL REVISION 1 POSTED
13 DEC 2012 THESIS PROPOSAL POSTED
26 NOV 2012 TECH REPORT III POSTED
21 OCT 2012 TECH REPORT II POSTED
18 OCT 2012

THESIS ABSTRACT POSTED

18 SEP 2012 TECH REPORT I POSTED
18 AUG 2102 BUILDING STATISTICS I POSTED
27 AUG 2012 CPEP ONLINE

 

CONTACT

Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work-inprogress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Sean Felton. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design

This page was last updated on April 28, 2013 by Sean Felton and is hosted by the AE Department ©2011