rending

Northeast Hospital Expansion

123 Medical Lane, USA

Home
Student Bio
Building Statistics
Abstract
Tech Reports
Proposal
Presentation
Final Report
Reflection
eStudio

FinalReport

Final Report

ExecSummary

Executive Summary

 

 

 

The final report conducted on the Northeast Hospital Expansion is located in the links above. This report includes four analyses in the Construction Management option. The analsyses are as follows: IPD methods implementation, patient room re-design for a shared wet wall, SIPS utilization for patient floors, and preassembled steel connection bridge. Two breadth options were also included. First a mechanical plumbing breadth was included with the re-design of patient rooms through the resizing of the sanitary, vent, hot water supply, and the cold water supply piping. A structural breadth was included with the preassembled steel connection bridge since the new pick needed to be verified that the crane could first lift them, and then pick points needed to be specified so none of the steel members would fail during the pick.