Final Report

 

INTRODUCTUION____________________________

This report studies 75 Ames Street, a 15 story, 250,000 square foot, office and lab building.  A study was conducted to see if there were any potential savings available in changing from a typical VAV system. It was also studied if an Aircuity system would have any great savings for labs. The study modeled an active chilled beam system in the place of the VAV system and the Aircuity system allowed for labs to be turned down to a minimum of 2 ACH. Within the report both individual savings, just adding one of the proposed systems, and a compound, both Aircuity and chilled beams, was studied.     

 

REPORT___________________________________

Final Report (EXECTUIVE SUMMARY))............................................................................

Final Report (FULL)........................................................................................................

 

Progress:

4/29/13 Senior Thesis Final Checklist Submitted
4/22/13 Reflection and & ABET Assessment Added
4/22/13 Reserach & References Added
4/9/13 Final Presentation PDF and PowerPoint Posted
4/3/13 Full Final Report & Executive Summary Posted
1/11/13 Building Stat II Posted
1/11/13 Proposal:Revision I Posted
12/14/12 Proposal Posted
11/12/12 Tech 3 Posted
10/13/12 Tech 2 Posted
10/12/12 Tech 2 Submitted
10/02/12 Abstract Posted
09/28/12 Abstract Submitted
09/19/12 Bio SketchPosted
09/17/12 Tech 1 posted
09/17/12 Turned in Tech 1
09/17/12 Building Statistics 1Posted
09/10/12 Bio Sketch Paper Copy Turned in
09/10/12 CPEP Website – Full Menu Functional
09/7/12 1st Page CPEP Online
09/7/12 Discussion Board Confirmed CPEP URL Added to Profile
08/31/12 Building Statistics Paper Draft Turned in
08/28/12 Attended Dreamweaver / CPEP Seminar
08/26/12 Resume submitted for AE Career Fair listing
08/26/12 Confirmed and/or Corrected Master List
08/26/12 turned in project initiation form part
08/26/12 turned in project initiation form part
08/26/12 Obatined Project Documentaion
08/26/12 Mailed AE Dept. Thank You letter to Pr
08/26/12 Sent Personal note,letter, email to co
08/26/12 Owner Permission Recieved