This senior thesis final report is the end result of the research and work from the AE 481W/482 courses. Using the Reston Station Phase 1 parking structure as a research and topic basis, 4 construction related issues as well as 2 breadths are discussed. These include the impacts of public-private partnerships, the use of bonded warehouses for equipment staging, utilizing SIPS sequencing for scheduling, and adding mechanical chases to the garage to facilitate better concrete penetration coordination. An executive summary as well as the full report can be accessed by clicking the respective links below.